Operational adjustments were made gradually, and project data were carefully monitored. This included reducing the minimum setpoints for the fresh air damper and lowering the air pressure in the ventilation system after the HVLS fans were activated.
Over time, the optimal balance between the ventilation system and HVLS fans was achieved. By the end of the commissioning period, the ventilation system’s power had been reduced from 27 to 16.5 kW (see figure).